With financing of the World Bank within the MUTS program, MRC will conduct transmission network analyses and prepare the country’s 10-year transmission network development plan to sustain growth in electricity demand and investments in power generation, both conventional and renewable energy. The assignment is also aimed to analyze potential issues on the power system due to increasing renewable integration and then identify measures to address those issues.